Tips

What information is needed to price the manufacture of a unipole sign?

لوحة يونيبول لبلدية نفي تحمل عبارة رافقتكم السلامة من تنفيذ فاكو

To price the manufacture of a unipole sign, prepare the installation site, the required sizes and the type of request, and make clear whether it includes the full structure or the advertising face only, and whether there is base work, lifting or lighting. Manufacturing work falls under the outdoor advertising signs service.

The unipole request file — what do you send?

  • The city, the installation location, and photos from more than one angle (do not replace the actual site with a generic photo from the internet).
  • Approximate measurements or drawings if available.
  • Is the sign new, or a replacement for an existing sign?
  • Is a full structure required, or a change of the advertising face only?
  • Lighting, printing or number-of-faces requirements.
  • If the space is rented: attach what shows the owner and the scope of the installation that is yours (FACO does not offer space rental).

The Nafi unipole signs project documents the preparation of the metal components, the base work, the lifting of the columns and the installation of the faces. This is an executed example that illustrates the manufacturing and installation stages, not a promise that every request will include the same scope.

Is manufacturing a unipole the same as renting advertising space?

No. FACO provides manufacturing, printing and installation according to the project. Renting the advertising space is done with the owner of the site (a municipality, a company or an individual). If you need a rental, complete the contract with the owner, then send the contract details and requirements to FACO so it can review the scope of design, printing and installation.

Frequently asked questions before ordering

What determines the cost? The sizes, the type of structure, the materials, the advertising face, the lighting, the condition of the site, the installation height, the city of installation, and any base or removal work if required.

Does the quote include permits? Site requirements and approvals with the relevant authorities are reviewed; the party responsible for them is specified in the agreement. Permit issuance is not assumed to be automatically included in manufacturing and installation.

How long does it take? It is determined after the specifications, the approved design and the scope of work have been reviewed. There is no single deadline for every project.

Request a quote review

Send the site file, the measurements and the city of installation through the contact page, and make clear if you have a space-rental contract from another party. We review the manufacturing and installation scope and set out the work included and excluded in the quote.

Leave a Reply

Your email address will not be published. Required fields are marked *